What the line sheet must show
- Category from-pricing in AUD with GST and freight assumptions clarified in the quote.
- Indicative lead time by category and the point at which production timing becomes binding.
- Best-fit stones for each category, including marble, travertine, quartzite, and sintered stone.
- Required quote inputs so studios do not lose time sending incomplete briefs.